Wednesday, 29 July 2026
The Daily Lagos

Local News, Lagos. Every Day.

Multiple Sources. Transparent Technology.

news

Lagos Road Contractors Adjust Schedules on Key Expressway to Reduce Sunday Delays

Targeted pauses in maintenance work on the Eti-Osa/Lekki/Epe Expressway form part of efforts to manage traffic movement across multiple corridors.

By Lagos News Desk · Published 25 July 2026

How we reported this

This article was written by AI from the linked sources and was not reviewed by a journalist before publishing. The Daily Lagos is part of The Daily Network and follows our reasonable editorial care.

Lagos traffic on Sunday, July 19, 2026, shows free-flowing movement on the Lagos-Badagry Expressway from Agbara to Iyana Era alongside smooth conditions on the Lagos-Abeokuta Expressway from Ile Epo to Ile Zik, while other routes experience slower progress.

Free-Flowing Sections

Drivers on the Lagos-Badagry Expressway report steady progress between Agbara and Iyana Era. The Lagos-Abeokuta Expressway maintains clear passage from Ile Epo through to Ile Zik, though movement slows near the Iyana Ipaja Underbridge and Charity intersection. These patterns allow some commuters to maintain normal travel times on the western and northern approaches into the city.

Congested Corridors

Significant buildup occurs on the Lagos-Ibadan Expressway around the Ojodu Berger axis. The Third Mainland Bridge records delays from Adeniji Adele toward Oworonshoki, with slower movement also noted toward Victoria Island via Eko Bridge. On the Lekki-Ajah axis, traffic moves slowly from Chevron to Ikate, influenced by high vehicle volumes and a prior incident involving a containerized truck at Chisco inward Jakande. Ikorodu Road sees backups from Mile 12 to Jibowu, while the Oshodi-Apapa Expressway faces restricted flow from ongoing roadworks and heavy vehicle activity. Agege Motor Road carries heavy traffic from Ikeja toward Agege.

Maintenance Adjustments

Contractors have temporarily vacated sections of the Eti-Osa/Lekki/Epe Expressway for the festive season, a step intended to ease pressure on commuters and support better movement in affected zones. This decision aligns with the observed free-flow conditions on parallel routes such as the Lagos-Badagry and Lagos-Abeokuta expressways.

Travel Considerations

Commuters can check conditions on the Third Mainland Bridge, Ojodu Berger axis, and Lekki-Ajah corridor before departure, as these remain the primary areas of slower movement. The combination of reported free-flow segments and the maintenance pause on the Eti-Osa/Lekki/Epe Expressway provides options for rerouting where possible.

References Sourced but Not Limited to:

Beta · AI-assisted · human oversight

Your newsroom. Shaped by you.

The Daily Lagos is in beta. AI may assist with research, summarising and drafting. Automated checks assess sourcing, accuracy and editorial risk before publication, and sensitive material is held for human review. Spotted something off, or want us covering a topic? Tell us. Your feedback is entirely optional and helps shape what we publish next.